Irrigation Program

Paddy cultivation in KADA is based on two seasons:

  • Off-Season (Season I):Occurs between March and July. The main water supply comes from river diversions, and the primary threat is drought. Planting achievement is 85%.
  • Main Season (Season II): Occurs between August and February. The main water supply comes from rainfall, and the primary threat is flooding. Planting achievement is 70%.

Water Supply Schedule

List of Pumping Stations of the Kemubu Agricultural Development Authority (KADA)

BIL LOCATION NUMBER (UNIT) LIFTING CAPACITY (m) CAPACITY (litre/second) POWER (KW)
1. KEMUBU 1 7 9.3 6200 920
2. KEMUBU 2 5 9.6 3200 420
3. LEMAL 8 8.9 3500 400
4. KASA 3 11 2300 317
5. SOKONGAN KASA 7 6 800 40
6. KUBANG PANJANG 3 4.4 1100 75
7. PARIT WAN 4 3.25 300 27
8. PISAU RAUT 4 6 440 40
9. TELOK JERING 3 4.9 425 45
10. SIMPANGAN (JPS) 3 4 400 30
11. KUBANG SAWA 2 3 200 22
12. JENERIH 5 3.9 500 37
13. S1K 2 2.4 500 37
14. GADING 6 9.3 560 75
15. SELIGI 6 6.1 560 75
16. DANAN 2 9.8 300 44
17. TOK AJAM 3 8 350 30
18. NARA 2 4 300 24
19. PASIR ARA 3 4.9 1100 75
20. KEMASIN LAMA 2 3.4 250 8.8
21. KEMASIN BARU 3 3.8 280 27
22. LUBUK TEMBESU 3 3.8 300 18.5
23. PAUH SEMBILAN 2 6 400 37
24. KE 23 4 6 440 40
25. KE 24 4 6 440 40
26. TERATAK PULAI 2 4 300 24
27. KD TERAP 3 6 440 40
28. KE 18 2 6 440 40
29. TUALANG SALAK 2 3 200 20
30. LADANG MERDEKA ANA 1 4 3.9 120 8.8
31. LADANG MERDEKA ANA 2 3 4.9 425 45
32. LADANG MERDEKA
TERBAK
2 7 50 4.7
33. LADANG MERDEKA
SENOR
2 4.9 56.7 4.7
34. LADANG MERDEKA
TOK LEBIR
2 4.4 20 2
35. LADANG MERDEKA
BUNUT SUSU
2 5 28.3 3.1
36. LADANG MERDEKA
TOK LIMIN
2 7 50 4.7

 

Source : Bahagian Kejuruteraan Awam