MAKLUMAT ASAS PENGAIRAN DALAM KAWASAN KADA
BUTIRAN.
|
2018
|
2019
|
2020
|
2021
|
2022
|
2023
|
|
Tali Air Utama (km)
|
130
|
130
|
130
|
130
|
130
|
130
|
|
a. Tanah
|
130
|
130
|
130
|
130
|
130
|
130
|
|
b. Konkrit
|
0
|
0
|
0
|
0
|
0
|
0
|
|
Tali Air Kedua (km)
|
224.3
|
224.3
|
224.3
|
224.3
|
224.3
|
224.3
|
|
a. Tanah
|
207
|
207
|
205.15
|
205.15
|
205.15
|
205.15
|
|
b. Konkrit
|
17.3
|
17.3
|
19.15
|
19.15
|
19.15
|
19.15
|
|
Tali Air Ketiga (km)
|
367.2
|
367.2
|
367.2
|
367.2
|
367.2
|
367.2
|
|
a. Tanah
|
301
|
301
|
283.08
|
283.08
|
283.08
|
283.08
|
|
b. Konkrit
|
66.2
|
66.2
|
84.12
|
84.12
|
84.12
|
84.12
|
|
Parit
|
700
|
700
|
700
|
700
|
700
|
700
|
|
a. Parit Utama (km)
|
214
|
214
|
214
|
214
|
214
|
214
|
|
b. Parit Kedua (km)
|
228
|
228
|
228
|
228
|
228
|
228
|
|
c. Parit Ladang (km)
|
258
|
258
|
258
|
258
|
258
|
258
|
|
Jalan Ladang (km)
|
776
|
776
|
1,663.20
|
1,663.20
|
1,663.20
|
1,663.20
|
|
Ban Sungai (km)
|
10.58
|
10.58
|
10.58
|
10.58
|
10.58
|
10.58
|
|
a. Rumah / Stesen Pam
|
17
|
17
|
20
|
20
|
20
|
20
|
|
b. Pintu Kawasan Utama
|
5
|
5
|
5
|
5
|
5
|
5
|
|
c. Jambatan / Pembentung
|
–
|
–
|
–
|
–
|
–
|
–
|
|
d. Pintu Kawasan Pasang Surut (TCG)
|
10
|
10
|
10
|
10
|
3
|
3
|
Sumber : Buku Rumusan Perangkaan 2023
Bahagian Kejuruteraan Awam
MAKLUMAT SISTEM PAM
BIL..
|
STESEN PAM.
|
BILANGAN PAM (unit)
|
DAYA ANGKAT (m)
|
KAPASITI PAM (liter/saat)
|
KUASA (kw)
|
1.
|
Stesen Pam Kemubu 1
|
7
|
9.3
|
6,200
|
920
|
2.
|
Stesen Pam kemubu 2
|
5
|
9.6
|
3,200
|
420
|
3.
|
Stesen Pam Lemal
|
8
|
8.9
|
3,500
|
400
|
4.
|
Stesen Pam Kasa
|
3
|
11
|
2,300
|
317
|
5.
|
Pam Sokongan Kasa
|
7
|
6
|
800
|
40
|
6.
|
Stesen Pam Kubang Panjang
|
3
|
4.4
|
1,100
|
75
|
7.
|
Stesen Pam Parit Wan
|
4
|
3.25
|
300
|
27
|
8.
|
Stesen Pam L.M Ana 1
|
4
|
3.9
|
120
|
8.8
|
9.
|
Stesen Pam Teluk Jering
|
3
|
3.4
|
300
|
27
|
10.
|
Stesen Pam Jenerih
|
5
|
3.9
|
500
|
37
|
11.
|
Stesen Pam S1K
|
2
|
2.4
|
500
|
37
|
12.
|
Stesen Pam Gading
|
6
|
9.3
|
560
|
75
|
13.
|
Stesen Pam Seligi
|
6
|
6.1
|
560
|
75
|
14.
|
Stesen Pam Danan
|
2
|
9.8
|
300
|
45
|
15.
|
Stesen Pam Tok Ajam
|
3
|
2.5
|
110
|
8.8
|
16.
|
Stesen Pam Kg. Nara
|
2
|
3.4
|
250
|
24
|
17.
|
Stesen Pam Kemasin Lama
|
2
|
3.4
|
250
|
8.8
|
18.
|
Stesen Pam Kemasin Baru
|
3
|
3.8
|
280
|
27
|
19.
|
Stesen Pam Pasir Ara
|
3
|
4.9
|
1,100
|
75
|
20.
|
Stesen Pam Lubok Tembesu
|
3
|
3.8
|
300
|
18.5
|
21.
|
Stesen Pam Pauh 9
|
2
|
3.9
|
500
|
37
|
22.
|
Stesen Pam KE 24
|
4
|
3.4
|
110
|
8.8
|
23.
|
Stesen Pam KE 23
|
4
|
3.4
|
280
|
27
|
24.
|
Stesen Pam KE 18
|
3
|
3.4
|
280
|
27
|
25.
|
Stesen Pam Sg. Pisau Raut
|
4
|
3.4
|
300
|
45
|
26.
|
Stesen Pam KD Kg. Terap
|
3
|
3.4
|
300
|
45
|
27.
|
Stesen Pam L.M Ana 2
|
3
|
3.4
|
300
|
45
|
28.
|
Stesen Pam Teratak Pulai
|
2
|
6
|
300
|
45
|
29.
|
Stesen Pam L.M Terbak
|
2
|
3.4
|
110
|
8.8
|
30.
|
Stesen Pam L.M Senor
|
2
|
3.4
|
110
|
8.8
|
31.
|
Stesen Pam L.M Bunut Susu
|
1
|
3.4
|
110
|
8.8
|
32.
|
Stesen Pam L.M Tok Lebir
|
2
|
3.4
|
110
|
8.8
|
33.
|
Stesen Pam L.M Tok Limin
|
1
|
3.4
|
110
|
8.8
|
Sumber : Buku Rumusan Perangkaan 2023,
Bahagian Kejuruteraan Mekanikal & Elektrikal
Kemaskini : 04/02/2025